Transportation of the ILMT container (with telescope structure, air bearing and optical corrector) on 2nd of March 2017. With the help of two hydras and one truck, the container has been transported up to the ILMT building from the entrance of the Devasthal site which is about 2 km apart.



Installation of the telescope structure by the AMOS team (Liège, Belgium) on 3rd March 2017. Videos showing the transportation of the structure elements.




